Ray Sumner

I cannot say enough about how very pleased we are with the excellent job Site Prep did for our shed pad installation! The installation began about 7:15 and, after marking the area and ensuring a perfectly square area, installation began. About 5 yards of soil had to be removed because of the angle of the ground (a total difference of 25″!), but great care was given not to damage a small tree nearby. Another great consideration was given as to the placement of the future shed and the location of the entry doors.

The work was completed in an incredibly professional manner with great attention to detail. The installation did not feel rushed, but the work never stopped except for water breaks!

What this review cannot show is the incredible effort at maintaining level over a 20′ span of 4X6 treated lumber…my interior walls are not this straight! The pad is within 1/16” square. Just crazy.

Great job!

Ray Sumner
Leave a Reply

Your email address will not be published. Required fields are marked *